A scaffold may stay up for several shifts and change as the job progresses. A lamp that worked when the deck was clear may be hidden by sheeting, and a cable that started above a walkway may end up crossing a ladder landing. Include the lighting and cable layout in the shift handover whenever the workface changes.
Walk the climb and the working deck
Review access points, each transfer between levels and the limits of the work area after dark. Use local light for inspection or fastening work and make sure the approach is visible when a worker is facing away from the task light. Have the scaffold team approve attachment points, added loads and retention arrangements for fittings and equipment.
Route cables around the job
Identify pedestrian routes, lifting paths, doors and sharp edges before deciding where cables should run. Confirm the support method suits the cable and environment. If the scaffold crosses a classified area boundary, include the equipment, connections and distribution locations in the site’s suitability review.
Match any net or barrier to the hazard
A dropped-object net, an opening barrier and a personnel fall-arrest system serve different applications. Have the competent team confirm the intended use, installation and inspection requirements. Daly’s catalogue includes CableSafe cable management and safety equipment and temporary lighting options, including SA Equip work-area lighting.
See HSE site-lighting guidance.
Contact Daly Middle East to discuss your project requirements.