A tank farm can look bright from the gate while operators are struggling to read a valve tag behind a pipe rack. Carry out the walkdown after dark and follow the actual operator route. Start at the approach road and record the transitions into stairs, bunds, pump bays and loading areas.
Record what people cannot see
Check whether a gauge can be read without casting a shadow across it. Look at stair landings, changes in level and the first tread on each flight. Ask drivers whether floodlights reflect off mirrors or windscreens on approach. Photograph problem points using equipment authorised for the area and mark them on a drawing so the designer can reproduce the sightline.
Identify the conditions behind each dark patch
A dark patch may call for a different aim, an additional local fitting or the removal of an obstruction. At the same time, record mounting constraints, corrosion exposure, hot surfaces and how technicians will reach each fitting. Determine where equipment crosses classified boundaries and have the responsible team review the latest drawing before selection.
Separate the lighting circuits on the review sheet
List normal task lights, route lighting and the fittings that form part of the emergency strategy. Record which assets serve each route after a supply failure. Daly’s Red Sky Lighting range includes fixed luminaires to evaluate for pump and access areas. Take the marked drawing and proposed mounting positions to the lighting survey team to develop the layout.