What to Include in a Hazardous-Area Lighting RFQ

Reviewed by the Daly Middle East technical team — application engineers specialising in ATEX/IECEx hazardous-area lighting and instrumentation.

A tender for “Zone 1 LED lights” leaves bidders to guess how the fitting will be used. One may quote a wide-beam model for a pump deck. Another may allow for a narrow optic, higher ambient temperature and an emergency circuit. Both offers can appear to answer the tender while pricing different jobs.

Describe the place and the work

Attach the current area classification drawing and identify where each fitting will sit. Include the applicable certification scheme, the required equipment protection level or category, the gas or dust group, the temperature requirement and expected ambient conditions. Zone 1 and Zone 2 refer to different likelihoods of a gas or vapour atmosphere during normal operation. North American Class/Division markings belong to a different classification scheme and should be checked against the project specification.

Tie the paperwork to the order code

Ask for the exact model and options offered, along with the nameplate marking, instructions and certificate schedules or declarations applicable to that configuration. ATEX is an EU regulatory framework. IECEx is an international conformity assessment system. The procurement team should confirm which evidence the client and jurisdiction accept. Review any conditions of use before approving the submittal.

Compare bids on the same basis

Give bidders a mounting layout, the tasks to be illuminated and the project’s lighting criteria. Request photometric files, fixture dimensions, mounting details and an itemised list of accessories. When reviewing a Red Sky Lighting option from Daly, record the exact configuration alongside the submission documents so the receiving team can check the delivered units against the approval.

Reference the EU ATEX equipment directive, EU workplace zone definitions and IECEx overview.

Contact Daly Middle East to discuss your project requirements.