SWRO45 seawater reverse osmosis skid alongside its pre-treatment package
Seawater Reverse Osmosis · SWRO45

Seawater in.
Potable water out.
On a single skid.

A complete, containerisable desalination package — pre-filtration, chemical dosing, high-pressure pumping and three-stage reverse osmosis — engineered and assembled in Dubai for offshore, marine and remote sites across the GCC.

0 m³/h
Permeate output
0 m³/day
Nominal capacity
0 bar
Operating pressure
<900 µS
Conductivity trip
What it is

The SWRO45 takes raw seawater and returns clean, remineralized drinking water — automatically, with a PLC-driven flush and production cycle and every stream monitored on one HMI.

Reverse osmosis forces pressurised seawater through semi-permeable membranes. Salts and impurities stay behind as brine; fresh water passes through as permeate. The SWRO45 wraps that principle in a rugged, transport-frame package designed to be dropped onto a deck or a slab and run.

It is built in two coupled skids: a pre-treatment package that protects the membranes, and the SWRO skid that does the desalting.

Skid-mounted 3-stage membranes PLC + HMI control Remineralization GCC-built
The process

Trace the water, stage by stage

Follow one drop from the sea intake to the tap. The line below carries permeate; at the membranes it splits into product water and brine — exactly as the system does.

01
Pre-treatment package with twin FRP media filters, backwash panel and dosing tank
Pre-treatment

Pre-filtration & backwash

Twin media filters (FT-1 & FT-2) run in parallel to strip suspended solids before the water ever reaches a membrane. Feed pressure sits at 3–5 bar. When the differential across the filters exceeds 1 bar, one tank drops into backwash while the other keeps filtering — no interruption to supply.

FT-1 / FT-2ΔP > 1 bar → backwash3–5 bar feed
02
Dosing and fine-filtration section with instrumentation panel
Conditioning

Dosing & fine filtration

Two dosing pumps condition the feed: SMBS neutralises residual chlorine, antiscalant keeps the membranes from fouling. A 10-micron cartridge filter provides the final polish. A safety relief valve caps permeate pressure at 3 bar.

SMBS · DOS-1Antiscalant · DOS-210 µm cartridge
03
High-pressure pump and instrumentation on the SWRO skid
Pressurisation

High-pressure pump

The heart of the system. The HP pump lifts the conditioned feed to roughly 57.9 bar — enough to overcome the osmotic pressure of seawater. The brine control valve is opened slowly to avoid water hammer, and pressure is held stable while flows settle in.

~57.9 bar working63 bar reliefInlet ≥ 1.2 bar
04
Three-stage Pentair Codeline pressure vessels housing LG SW400 membranes
Separation

Three-stage RO membranes

Feed passes through three pressure vessels in series, each holding an LG Chem seawater membrane matched to its stage. Fresh water permeates through the membrane wall; the concentrated remainder carries on as brine. This is where seawater becomes two streams.

Stage 1 · LG SW 400 SRStage 2 · LG SW 400 RStage 3 · LG SW 400 ES
One feed → two streams
Permeate ↑
≈ 1.88 m³/h
Product water — sampled, measured on the digital flow meter, then sent on to remineralization.
Brine / waste →
≈ 3 m³/h
Concentrate rejected to waste through the brine control valve at the back-pressure set point.
05
SWRO control panel with HMI, and permeate outlet manifold
Polishing

Remineralization & delivery

RO water is aggressive and near-empty of minerals, so it passes through a calcite/gravel remin bed to restore hardness and balance the pH. The finished water leaves at the potable outlet; conductivity is watched continuously and the system trips before quality can drift.

Calcite + gravel bedPermeate manifoldPotable outlet 1"
By the numbers

Performance & setpoints

Operating figures taken straight from the SWRO45 commissioning and HMI configuration.

Permeate flow
1.88 m³/h
≈ 45 m³ per day of product water
Brine / waste flow
3.0 m³/h
Concentrate to waste
Working pressure
57.9 bar
Held stable at the HP manifold
Membranes
3 stages
LG SW 400 SR / R / ES in series
Pre-filtration
2 × media
FT-1 & FT-2 parallel + backwash
Cartridge polish
10 µm
Ahead of the membranes
Inlet minimum pressure
1.20 bar
Outlet maximum pressure
62.00 bar
Conductivity warning level
850 µS
Conductivity trip
900 µS
SWRO45 skid with control panel, HMI and pressure vessels
Control & automation

Start it, and it runs itself

A Schneider PLC and HMI drive a fixed start-up sequence — flush, then produce — with pressure, flow and conductivity interlocks guarding the membranes at every step.

  1. Power & initialise

    Switch on the isolator and the selector. A 20-second start-up delay lets the controller settle.

  2. Flushing mode

    Press start: the safety and solenoid valves open and SMBS dosing runs for 5 minutes, then the system stands by.

  3. Production mode

    Press start again: inlet MOV opens, the HP pump ramps up, antiscalant dosing begins and the dump valve moves to production.

  4. Pressurise & hold

    Throttle the brine control valve slowly to ~57.9 bar and watch until permeate and brine flows are stable.

System architecture

Piping & instrumentation diagram

The complete P&ID showing every valve, sensor and pressure point from intake through permeate delivery and brine reject.

SWRO45 Piping and Instrumentation Diagram - complete system schematic
Pre-treatment details

Backwash & media replacement

How the dual-tank media filter system operates: parallel filtration with cross-over backwash when differential pressure exceeds 1 bar.

Prefilter filter mode - FT-1 and FT-2 operating in parallel
Filter mode — 3-5 bar inlet
Prefilter Tank 1 backwash mode
Tank 1 backwash — FT-2 continues

Each filter tank can be independently thrown into backwash while the twin continues to filter. The backwash water is diverted to the backwash tank. When differential pressure exceeds 1 bar, the backwash cycle is initiated automatically by the control system.

Commissioning guide

Start-up sequence & control steps

Visual breakdown of each stage from the training manual: power-up through flushing and into production mode.

SWRO45 Control Panel overview
Control panel & HMI
SWRO45 Power isolator activation
Step 1: Power isolator ON
SWRO45 Initialization and selector switch
Step 2: Selector to ON
SWRO45 Flushing mode operations
Step 3: Flushing 5 min
SWRO45 Production mode startup
Step 4: Production mode
SWRO45 Pressurize and stabilize
Step 5: Pressurize
Why build with us

A technical partner, not just a supplier

Engineered for the region

Designed for GCC feedwater, heat and duty cycles — offshore platforms, marine, camps and remote sites.

Quality components

Pentair Codeline vessels, LG Chem membranes and Schneider controls — specified to last and serviceable anywhere.

Full-process design

Intake, pre-treatment, RO and remineralization delivered as one coordinated, skid-mounted package.

Commissioning & support

Wet-tested before dispatch, with start-up, operator training and ongoing service across the GCC.

Trusted components
Pentair CodelineLG ChemSchneider ElectricGrundfosProMinent
Get started

Specify your water, and we'll size the system.

Tell us your feedwater, the volume you need and where it's going. We'll come back with a configured SWRO package and a quote.

Company
Daly Middle East
Hazardous-area & water treatment equipment
Head office
Dubai, United Arab Emirates
Region
UAE · Saudi Arabia · Qatar · Oman